Steam Boiler Dome

This dome was transported from Cartagena to Cali for the client Incauca.
Main difficulties: Road “la línea” between Ibague and Calarcá, due to the curves. Traffic handling, contraflow and several stops before curves, since we needed both lanes to maneuver due to the angle of the curve.

Dimensions: Length 22 meters
Weight: 107 Tons

Recent Posts

Barbados

Project carried out in mid 2020, one month of continuous operation for which personnel (7 people)

Barrancabermeja Reactor

A reactor was transported and installed for the ecopetrol plant in Barrancabermeja. Transportes Montejo moved the

Mining Sholves

Several mining shovels have been transported throughout this year 2020 and previous years. This machinery is

Steam Boiler Dome

This dome was transported from Cartagena to Cali for the client Incauca. Main difficulties: Road “la

Boeing 707

In 2018 a challenging service was obtained by the Colombian Air Force to mobilize one of

Heliconias Project

The transportation of 7 transformers from San Jerónimo Antioquia to Heliconias was executed. Main difficulties: The