(+57 601) 511 6080
(+57) 315 316 5232

Monday to Friday 8:00AM - 6PM
Saturday 8:00AM - 12M

Uncategorized

Heliconias Project

The transportation of 7 transformers from San Jerónimo Antioquia to Heliconias was executed. Main difficulties: The access road to the project is an extremely narrow and complex tertiary route for the use of heavy equipment due to its condition and deterioration. Millions of dollars were invested for adaptation, pruning of trees (rapid growth given the […]

Heliconias Project Read More »

Boeing 707

In 2018 a challenging service was obtained by the Colombian Air Force to mobilize one of the most important aircraft, the Boeing 707 (Also called “Zeus”). The aircraft went out of service and given its importance and history would be placed in a museum for commemoration. This service started from the air force facilities (El

Boeing 707 Read More »

Steam Boiler Dome

This dome was transported from Cartagena to Cali for the client Incauca. Main difficulties: Road “la línea” between Ibague and Calarcá, due to the curves. Traffic handling, contraflow and several stops before curves, since we needed both lanes to maneuver due to the angle of the curve. Dimensions: Length 22 meters Weight: 107 Tons

Steam Boiler Dome Read More »

Mining Sholves

Several mining shovels have been transported throughout this year 2020 and previous years. This machinery is equipment that is not designed to move 40 kilometers because the cost of wear and spare parts is much higher than subcontracting us to move (they are designed to work in a fixed site, if they are going to

Mining Sholves Read More »

Barbados

Project carried out in mid 2020, one month of continuous operation for which personnel (7 people) and equipment were mobilized from Colombia. The objective of the project was to transport 4 Wartsila engines and manually position them at the plant. However, given the conditions of the road infrastructure, transportation was carried out from the storage

Barbados Read More »